ISO 11295:2022
p
ISO 11295:2022
79752

Abstract

 Preview

This document specifies the steps of the overall process of pipeline rehabilitation, comprising:

—    information on strategic and tactical activities:

a) investigation and condition assessment of the existing pipeline;

b) pipeline rehabilitation planning.

—    information on and requirements for operational activities:

c) project specification;

d) applications of techniques;

e) documentation of the design and application process.

Definitions and classification of families of renovation and trenchless replacement techniques are provided, and their respective features described. Areas of application covered include underground drainage and sewerage networks and underground water and gas supply networks.

The following aspects are not covered by the scope of this document:

—    new construction provided as network extensions;

—    calculation methods to determine, for each viable technique, the characteristics of lining or replacement pipe material needed to secure the desired performance of the rehabilitated pipeline;

—    techniques providing non-structural pressure pipe liners;

—    techniques for local repair.

It is the responsibility of the designer to choose and design the renovation or trenchless replacement pipeline system.


General information 

  •  :  Published
     : 2022-01
  •  : 3
     : 67
  •  : ISO/TC 138/SC 8 Rehabilitation of pipeline systems
  •  :
    23.040.01 Pipeline components and pipelines in general
    23.040.01 Pipeline components and pipelines in general

Buy this standard

en
Format Language
std 1 187 PDF + ePub
std 2 187 Paper
  • CHF187

Got a question?

Check out our FAQs

Customer care
+41 22 749 08 88

Opening hours:
Monday to Friday - 09:00-12:00, 14:00-17:00 (UTC+1)

Keep up to date with ISO

Sign up to our newsletter for the latest news, views and product information.