Norme internationale
IWA 33-3:2021
Technical guidelines for the development of small hydropower plants — Part 3: Design principles and requirements
Numéro de référence
IWA 33-3:2021
Edition 1
2021-03
Norme internationale
Prévisualiser
p
IWA 33-3:2021
82192
Indisponible en français
Publiée (Edition 1, 2021)

IWA 33-3:2021

IWA 33-3:2021
82192
Format
Langue
CHF 194
Convertir les francs suisses (CHF) dans une autre devise

Résumé

This document specifies the general principles and basic requirements of design for small hydropower (SHP) projects up to 30 MWe, mainly including hydrology, geology, energy calculations, project layout, hydraulics, electromechanical equipment selection, construction planning, project cost estimates, economic appraisal, social and environmental assessments.

Application of this document is intended to be site specific, with the principles and requirements of design applied in accordance with the needs of proposed hydropower plant.

Informations générales

  •  : Publiée
     : 2021-03
    : Norme internationale publiée [60.60]
  •  : 1
  • ISO/TC 339
    27.140 
  • RSS mises à jour

Vous avez une question?

Consulter notre FAQ

Service à la clientèle
+41 22 749 08 88

Horaires d’ouverture:
De lundi à vendredi - 09:00-12:00, 14:00-17:00 (UTC+1)